Home Gallery About Contact

Service

Playground
surfacing

Safe, CSA-compliant rubber surfacing for daycares, schools, and municipal parks across Southern Ontario. Engineered fall heights, smooth wheelchair-accessible finish, and full-colour design freedom.

Why Playground Surfacing

Built to play hard.
Built to keep kids safe.

Fall protection

Every install is designed around your tallest play structure. We document critical fall height, HIC, and Gmax to CSA Z614 / ASTM F1292: the numbers your inspector wants to see.

AODA accessible

Smooth, firm, gap-free surface. Strollers, wheelchairs, walkers, and mobility devices roll freely. No edges, no trip points, no exclusion.

Full-colour design

Hopscotch lines, alphabet grids, themed maps, brand logos: anything you can sketch, we can pour. Schools love this for outdoor learning zones.

Built for Canada

Flexible EPDM stays workable through -40°C winters and 40°C summers. No cracking, no asphalt-style fatigue, no annual top-up.

Technical Specs

What goes into
every install.

Rubber surfacing isn't just poured and left. Every install is engineered for the specific site, use case, and fall height. Here's what we specify on every project.

Surface TypePoured-in-place (PIP) EPDM rubber
Base LayerSBR recycled rubber, 75–100mm typical
Wear LayerEPDM colour granules, 12–13mm typical
Fall StandardCSA Z614 / ASTM F1292 (documented where required)
DrainagePermeable throughout, drains through surface
Temperature RangeRated to -40°C / +60°C
Colour OptionsFull EPDM palette: standard and custom blends
Typical Lifespan15–20+ years with routine maintenance
Sub-base RequirementCompacted granular A or existing asphalt
Cure Time24–48 hours (weather dependent)

Who It's For

Who we build playgrounds for.

Licensed daycares

Our most common install. We work around naptime, plan around licensing inspections, and stage the build so your yard stays operational where it can.

K–12 schools

Public, separate, and private boards across the GTA and Niagara. We handle PO procurement, prevailing-wage compliance where required, and summer-window installs.

Municipal parks

Township, regional, and city builds. Full CSA documentation, ITT/RFP-ready specs, and accessibility reporting that survives audit.

Project Photos

Installed by our crew.
Built to last.

View Full Gallery →
Poured-in-place rubber surfacing on a playground
Kids playing on daycare rubber surfacing
Playground rubber surfacing
Safe play rubber surfacing at a daycare playground
Rubber surfacing with turf and log tube play structure
Rubberscape rubber surfacing around a playset
Log tunnel play area with rubber surfacing

Ready to build a safer play space?

We'll come to your site, measure the space, and give you a detailed quote. No obligation, no pressure.